WorkPlan – WP3

WP3 - Integrating impact models and tools in a Multi-Hazard operational early warning System

LEADER: HYDS

PARTNER: HYDS, CFR, CIMA, UPC, FMI, WUR, ECMWF, UNIGE, UOR, DAPP, JRC

OBJECTIVE: The main goals of WP3 are:

Design a flexible and scalable framework to integrate both the forecast and impact models developed within WP2, and the existing Pan-European platforms, into a common operational Multi-Hazard operational Early Warning System [MH-EWS], compiling with the guidelines provided by WP1.

  • Design a set of products and services and their interfaces, to be provided by the MH-EWS to the different users (applications developed within WP4 and WP5 and third party users) in order to make possible hazard/site-specific applications able to both connect with legacy systems and/or build tailored solutions.
  • Build the operational MH-EWS in a modular and scalable decentralized architecture using standardized technologies.
  • Test and validate the MH-EWS in the Pilot Sites, case studies and SME platform applications, including providing feedback to models and tools developers to cyclical review and update them.

The different technologies used within the MH-EWS rank between TRL4 to TRL6 and the objective is to deliver an operational platform in a real environmentuniformly at TRL7.